Solutions for water infrastructure
Key Markets
WATER SUPPLY SYSTEMS
Source to tap solutions rural areas, including well and surface water systems, pump house design, distribution piping, and connections to domestic plumbing
ONSITE WASTEWATER (SEPTIC) SYSTEMS
Engineered designs for residential or commercial septic systems, including regulatory documentation. For more, see West Coast Septic: www.westcoastseptic.ca.
PUMP STATIONS
Design of pump stations, including control philosophy, equipment specifications, inspections, and operator training. Operation and Maintenance Manual (O&M) compilation.
HYDROPOWER
Feasibility studies, concept designs, energy models, hydraulic structure design, cost estimates, and construction support.
RESIDENTIAL WATER SYSTEMS AND PLUMBING
Designs and specifications for storm and sanitary pump systems
Feature Project
2024
Micro Hydro Study - Tank Creek, Yukon
Beaty Hydro and a team of consultants are developing a feasibility level study for a micro hydro plant located in the Yukon. Highlights include:
Concept designs for intake structures, powerhouse, and penstock
Hydrology study
Energy model for estimating annual energy generation
Financial analysis
Feature Project
2024
Quesnel River Pulp - Water System Audit
In the Fall of 2024 Beaty Hydro will complete an audit of the QRP pulp mill domestic water system. The audit will focus on improvements to safety, functionality, and drawing updates.
Feature Project
2024
Onsite Wastewater (septic) System Design
Daisy Lake - Sea 2 Sky Corridor
Beaty Hydro completed a unique, commercial onsite wastewater system for a retreat facility near Daisy Lake within the Sea 2 Sky. The project features many custom design elements while remaining fully compliant with BC's Sewerage System Regulation.
Feature Project
2024
BC Parks Ten Mile Lake Provincial Campground Water System Upgrade. This project will feature a new water treatment building, potable water treatment system, supply and distribution piping, and upgrades to existing infrastructure.
Feature Project
2020 - PRESENT
Site C is a 1,100 MW hydroelectric plant located near Fort St. John in north-eastern British Columbia. The plant is currently under construction with a target completion date of 2024. Beaty Hydro is responsible for the detailed design, procurement, commissioning and system training for highly customized pump system equipment required for pressure testing the massive 2,800 cubic meter spiral cases surrounding each turbine. Beaty Hydro's design and procurement work is currently ongoing, with a scheduled system implementation date of Summer 2021.
UPDATE - February, 2022 - Success! Beaty Hydro’s custom designed pump skids for Site C are commissioned and running like a top! 2 of 6 turbine generator unit spiral cases have now been pressure tested. The critical concrete pressure embedment process is now underway.
UPDATE - June, 2021. As of June 2021 the pressure testing skids are fabricated and on their way to Site C. Beaty Hydro is providing on-site commissioning, and will continue to support the Client with on-site assistance through implementation.
Feature Project
2023
Type 3 Onsite Wastewater System - Bowen Island, BC.
West Coast Septic, a subsidiary of Beaty Hydro, completed a septic system for a technically challenging site on Bowen Island, with steep slopes and entirely bedrock subsurface. The system features a Type 3 wastewater treatment plant, an MBBR technology and UV Disinfection. Uniform distribution sand mound type disposal field and constructed receiving area.
Feature Project
2021
The Haisla Water System is a municipal water pumping and distribution project located within Kitamaat Village, on the west coast of British Columbia. It is a major milestone in water security for the Haisla First Nation. The system features groundwater wells, a booster pump station, storage reservoirs, and state of the art materials and equipment.
Beaty Hydro is involved with final project completion, commissioning, training materials, and writing the Operation and Maintenance manual for the system.
https://www.bclocalnews.com/news/new-water-system-will-end-interruptions-in-kitamaat-village/
Feature Project
2023
Beaty Hydro completed this extremely fast-tracked project in conjunction with Stormtec Filtration, to deliver a construction water supply pump system from design->commissioning in just 4 weeks! Beaty Hydro was able to meet the Client’s tight schedule, providing design drawings, field reviews, and commissioning support. The project included 3D Piping modelling, P&IDs, design reports, and ongoing support.
Andrew Beaty, P. Eng.
Andrew is a Professional Engineer from Vancouver, Canada. He has over 15 years of experience in the design, construction, and commissioning of major pump stations and hydroelectric power stations across Canada and on 5 continents. Andrew is a highly capable engineer and manager with a proven track record of delivering successful projects. He is skilled in both engineering design and project management.
In 2018, Andrew started Beaty Hydro Corporation, a fully-insured engineering company providing the full suite of engineering services in multiple disciplines. His clients range from major construction companies and leading engineering firms to small independently owned businesses and individual property owners. Under Beaty Hydro, Andrew has successfully completed projects as lead designer, project manager, and Owner's Engineer. Andrew provides effective coordination between Owners, equipment suppliers, construction contractors, and engineers.
Memberships and Affiliations
American Water Works Association (AWWA)
BC Water and Waste Association (BCWWA)
BC Small Water Systems Community Network
British Columbia Construction Roundtable (BCCR)
Western Canada Onsite Wastewater Management Association (WCOWMA)
Contact
Mailing Address
Beaty Hydro Corporation
3782 Ontario St, Vancouver, BC, Canada, V5V3G2
CLIENTS